FORWARD RX80x400 carried out the first drilling operations on 2 objects.

Equipment

FORWARD RX80x400

Dates September, 2018
Work period 10 days

Location

Tatarstan, Russia

Project details

On the first object the FORWARD RX80x400 drilling rig completed the laying of a steel pipe for oil and gas industry with the diameter of Ø450 mm and the length of 560 m. 3 steps of reaming - 400 mm, 650mm, 740 mm.

On the second object the FORWARD RX80?400 carried out the laying of an electric cable with the diameter of Ø89 mm and the length of 560 m for technical control under the oil and gas pipes. 

Soil type

Activated clay

  

 

 

 

First drilling of FORWARD RX80x400 in Russia

 

First drilling of FORWARD RX80x400 in Russia

 

First drilling of FORWARD RX80x400 in Russia

 

First drilling of FORWARD RX80x400 in Russia

 

First drilling of FORWARD RX80x400 in Russia

 

First drilling of FORWARD RX80x400 in Russia

 

First drilling of FORWARD RX80x400 in Russia

 

First drilling of FORWARD RX80x400 in Russia

 

First drilling of FORWARD RX80x400 in Russia

 

 

 

First drilling of FORWARD RX80x400 in Russia

 

First drilling of FORWARD RX80x400 in Russia

 

First drilling of FORWARD RX80x400 in Russia

 

First drilling of FORWARD RX80x400 in Russia

 

First drilling of FORWARD RX80x400 in Russia

 

First drilling of FORWARD RX80x400 in Russia

 

First drilling of FORWARD RX80x400 in Russia

 

First drilling of FORWARD RX80x400 in Russia

 

First drilling of FORWARD RX80x400 in Russia

 

First drilling of FORWARD RX80x400 in Russia

 

First drilling of FORWARD RX80x400 in Russia

 

First drilling of FORWARD RX80x400 in Russia

 

First drilling of FORWARD RX80x400 in Russia

 

 


See also: